Quality Control

1 Ground Survey Work

2 Excavation

3 Foundation Reinforcement and Shuttering

4 Column First Lift RCC

5 Column Second Lift with PEB Bolt2

6 Plinth Filling with Compaction

7 Floor Metal Soling 2

8 Floor Reinforcement Mesh

9 Floor RCC water ponding

10 RCC Staircase

11 RCC Slab

12 RCC Road Water Ponding

13 Connecting Bridge Shuttering

14 Test Track Road

15 Recharge Well

1 Site Quality Lab

2 compaction of soil

3 compaction of soil

4 compaction of WMM and Metal

5 box culvert installation

6 Field dry density (core cutter) test

7 Aggregate impact value test

8 Gradation test of river sand

9 trimix work of road

10 RCC floor

11 curing

12 Pile reinforcement with concrete cover
